Work Day report: July 12th 2020

Thanks to all for a huge turnout and lots of productive work including:

  • Pen corner flower bed created and shrubs planted
  • Roadside hedges weeded, tidied and de-boxed 
  • Brambles cut back and sapling surrounds cleared in the Dell
  • Cannon Road end and Clubhouse flower beds weeded and tidied
  • New compost brew initiated and compost/chippings wheeled to new bed
  • Green waste gathered and stacked for Council collection
  • Pond edges and water edges cleared and tidied
  • Litter picked and paths swept
  • Top and park side trimming of deciduous hedge begun
  • Mrs Tufted-Duck and 11 little’uns ushered from tennis court and re-floated
  • Grassy slopes sat upon, refreshments taken and chocolates enjoyed (thanks, Alison)

Next date: Sunday 2nd August – hope to see as many of you as can make it