Work day: 24th April 2022

A number of possibilities presented themselves: Flower bed weeding and tidying; Compost management (including soil from work on the mosaic circle); Litter picking;  Removing and recycling pond debris; Dead-heading daffs; Lifting the turf and smoothing the grass run to the top of the mosaic setts; Pruning and tidying the Dell behind Court 5. In the…

Read More

Work day: 27th March 2022

With Spring in our step, we managed all this: Plant daffodil bulbs left by Anna;  Litter pick, including roadsides by courts 1 and 4 and stretch behind court 5 and the run behind Conway gardens; Prune and tidy flowers around the Clubhouse; Gather twigs left alongside court 3 after Council pruned the hedge and leave…

Read More

Work day: February 27th 2022

Well, what a cracking day! Martin’s no-rain dance must have gone on the whole of last night. Thanks for turning out and working so hard. Fallen branches were gathered, bulbs planted, beds nurtured, litter picked, compost turned, mortar mixed, stones shaped, islands built and coffees and pastries consumed. Very few stones were left unturned. If…

Read More